MODULE 02 · SITE MASTERPLAN · ALY-DC-ARCH-002

485 acres, planned to the metre.

The planning-grade campus layout: Fields A–F carry the 185-acre operational campus; Field G holds 300 acres for expansion, habitat and agrivoltaics. Click any zone for its specification; step the build phases; switch on the security, drainage and landscape layers.
N ↑ FIELD G — 300 ACRES future expansion · habitat management · agrivoltaics (masterplanned, not committed) FIELDS A–F — 185-ACRE OPERATIONAL CAMPUS BESS FARM — 600 MW / 2,400 MWh ~40 acres · NFPA 855 separation · 2 × 6-unit strings CENTRAL COOLING PLANT — DRY COOLERS · CHILLERS · AHU 132 kV GIS + TX1–TX3 customer switchyard · 3 × 150 MVA ADMIN · NOC security · logistics PRIVATE-WIRE BAY Seagreen termination SSEN ALYTH 400/132 kV SUBSTATION point of connection · fiscal meter · adjacent (0 km) site GIS ↔ SSEN: adjacent — zero-cable-risk connection SUDS ATTENUATION gravity-fed · site low point GATE 2 · OPS GATE 1 · CONSTRUCTION 4.5 km perimeter · 3 m fence · CCTV · PIDS Seagreen onshore cable (route TBC · S.37) A93 / A926 access (~0.5 km) Alyth village ~2.5 km E · noise/visual separation maintained by bund + distance

Spatial Strategy

Key separations

GIS → SSEN substation0 km — adjacent
BESS → data halls>50 m (NFPA 855) · 100–300 m typical
Cooling plant → halls50–200 m chilled runs
Halls → site boundary200–500 m buffer
Alyth village → site centre~2.5 km

Design principles

Security by separation (BESS vs halls) · gravity-fed SUDS to the low point · cooling exhaust placed downwind of AHU intakes against the SW prevailing wind · Phase 1 operates while Phase 2 builds via segregated ring-road traffic · 3–5 m native-planted bund for screening and habitat.

Land budget

Total site485 acres
Operational campus (A–F)185 acres
BESS farm~40 acres
Hall campus~60 acres
Plant + GIS~20 acres
Access, SUDS, landscape~65 acres
Field G (reserved)300 acres