| GIS → SSEN substation | 0 km — adjacent |
| BESS → data halls | >50 m (NFPA 855) · 100–300 m typical |
| Cooling plant → halls | 50–200 m chilled runs |
| Halls → site boundary | 200–500 m buffer |
| Alyth village → site centre | ~2.5 km |
Security by separation (BESS vs halls) · gravity-fed SUDS to the low point · cooling exhaust placed downwind of AHU intakes against the SW prevailing wind · Phase 1 operates while Phase 2 builds via segregated ring-road traffic · 3–5 m native-planted bund for screening and habitat.
| Total site | 485 acres |
| Operational campus (A–F) | 185 acres |
| BESS farm | ~40 acres |
| Hall campus | ~60 acres |
| Plant + GIS | ~20 acres |
| Access, SUDS, landscape | ~65 acres |
| Field G (reserved) | 300 acres |